Kathleen Hume– Principal Architect
Kathleen Hume (née Houison) is a registered architect in WA and the Director of Hume Healthcare Architects Pty Ltd. She is a specialist healthcare design architect and planner with over 30 years of experience in the field. Kathleen has worked on a variety of public and private health care projects and followed projects through from needs assessment through all stages to commissioning.
Kathleen is acutely aware of the evidence of good design on patient well-being and recovery and keeps abreast of the latest trends. Her personable nature and competence have earned her the respect of clients and consultants alike.
Kathleen graduated in 1990 and started working for a boutique healthcare design practice (1990-1992). After completing her board exam in 1992, she joined a prominent South Africa-based healthcare design architectural practice– FGG Architects (1992-2003). Here she worked on many major healthcare projects in South Africa, such as the Inkosi Albert Luthuli Hospital, an 860-bed tertiary hospital.
Kathleen was offered a partnership at FGG in 2002. A year later, with the logistical support and encouragement of her partner, she decided to start her own practice– Kathleen Houison Architect (2003-2008). She also started Health Facility Planning in partnership with a fellow consultant Renee du Toit, a registered nurse and IPC consultant. Together, they offered courses in healthcare design, accredited with CPD points and credits at university level (2004-2008).
In 2008, Kathleen and her family migrated to Perth, WA. In the same year, she joined the renowned Silver Thomas Hanley (STH) healthcare design practice in WA. This experience enabled her to become familiar with local healthcare practices and meet local consultants. As Project Architect in STH, Kathleen worked on a variety of healthcare projects.
In 2012, Kathleen went into private practice and was invited by the Department of Health, Licensing and Accreditation Regulatory Unit (LARU) to join a panel of independent consultants who are responsible for reviewing licensing applications for various types of WA-based private healthcare projects, such as psychiatric hostels, nursing homes, and day hospitals (Class A, B and C). The said reviewing process covers the entire duration of a project that consists of the following stages in chronological order: Concept Design, Approval in Principal (AIP), Approval to Construct (ATC), and Approval to Occupy (ATO).
From 2012 to 2018, Kathleen continued with LARU consulting work and assisted her partner in healthcare design for Silver Chain and Ramsay Health.
In August 2018, she started her own dedicated healthcare design practice in August 2018, namely Hume Healthcare Architects Pty Ltd.
- Linear Advanced Cancer Trials Centre, Current
- Richmond Wellbeing, 25-bed Psychiatric Hostel, Orelia, Refurbishment, Current
- Perth Children’s Hospital, Eating Disorder Clinic, Refurbishment, Current
- Perth Children’s Hospital, Covid-19 Readiness Works, 2021-2022
- Richmond Wellbeing, 8-bed Youth Psychiatric Hostel, Queens Park, Refurbishment, Practical Completion April 2022
- Sir Charles Gairdner Hospital, Endoscopy DPU Masterplan and Stage 1 Refurbishment, Practical Completion January 2021
- Sir Charles Gairdner Hospital Covid-19 extension to ED, Fast Track, Treatment, POP, EYE, Isolation.
- Sterequip in Epping, VIC– Outsourced Theatre Instrument Reprocessing Facility (CSSD), Practical Completion December 2022
- Sterequip in Milperra, NSW– Outsourced Theatre Instrument Reprocessing Facility (CSSD), Current
- Sterequip in Bayswater, WA – Outsourced Theatre Instrument Reprocessing Facility (CSSD), Current
- Sterequip in Banyo, QLD – Outsourced Theatre Instrument Reprocessing Facility (CSSD), Current
- Salvado, Psychiatric Medical Suites at 230 Rokeby Road, Subiaco internal fit-out
- Glengarry Private Hospital CSSD/OT – WA, Current
- Glengarry Private Hospital DPU, WA, 2017-2018
- Glengarry Private Hospital, Mother Baby Unit, Current
- SleepMed Australia, Murdoch Respiratory Centre, Class B facility, Leeming WA, 2015-2016
- Margaret River Private, Class 9A Hospital and Outpatients for AOD, Metricup WA, On Hold
- State Rehabilitation Service, 140 bed new build Rehabilitation Services Building, Murdoch WA, 2009-2013
- St John of God Bunbury. Additions, Coronary Care Unit and Comprehensive Cancer Centre, 2011-2013
- St John of God Murdoch, WA– Redevelopment, 2012
- St John of God Murdoch, Murtec training facility, WA– Alterations to Medical Records and training facility
- Waikiki Private Hospital, Rockingham. Minor works for Compliance
- Silver Chain– Kingsley Home Base Redevelopment, WA, 2016
- Silver Chain – Maddington Clinic Redevelopment, WA, Current
- Silver Chain – Mandurah Clinic Redevelopment, WA, On Hold
- Fiona Stanley Hospital, 643-bed tertiary hospital, WA, 2009
- Oxford St Dermatology– Day Procedure Unit, Perth, WA
- Gateway, 120 bed Specialist Private Hospital, Umhlanga– Business Plan, Brief, and Master Plan
- Hibiscus Private Hospital, Port Shepstone Major Redevelopment
- Inkosi Albert Luthuli, new 860 bed Tertiary Hospital
- Umkhumbane Community Health Centre, Durban– Review
- Hollywood Endoscopy Unit Document review and ATO
- Hollywood Mental Health Day Unit & 30 bed Mental Health IPU, review and ATO
- Hollywood PH – Acute Psychiatric Inpatient Unit – review – Approval to Occupy
- Sundew Day Surgery- Documentation and facility review
- Woodville House Psychiatric Hostel – Facility Review
- Bradford view Nursing Home – Facility Review
- ICON Cancer Centre Rockingham -Doc & Facility Review
- ICON Cancer Centre Midland – Doc & Facility Review
- Western Haematology and Oncology – Documentation review and ATO
- Craigie Day Hospital, new build – Documentation Review and ATO
- Absolute Cosmetic Medicine – Documentation Review and ATO
- West Leederville Private Hospital, new, Documentation and Facility Review
- Perth Eye Hospital – Occupation Inspection and later Facility Review
- Perth Clinic, minor works and new MH Outpatient Facility – Documentation Review
- Abbotsford Private Hospital Mental Heal Unit, 2020 – Documentation review
- Ming anew Nursing Post, minor works – Documentation Review
- Lucy Creeth Nursing Home – Occupation Review
- Fitzroy Crossing Renal, new building – Documentation and Facility Review
- Attadale Private Rehabilitation Hospital – Documentation Review and ATO
- Murdoch Surgicentre, minor works CSD- Approval to Occupy
- Fresh Start Class B Day Procedure Unit – New licence application, facility Review
- St John of God, Subiaco, New Nursery – Approval to Occupy
- Armadale Neonatal Nursery – Documentation review and site review
- Romily House Psychiatric Hostel – Facility and Minor Works review
- Lady Lawley Cottage by the Sea, Nursing Home – Change of Function approval
- Academy Day Hospital – Drawing & Facility Review
- Joondalup Health Campus, new Paediatric Ward – Doc. Review, ATO
- Joondalup Health Campus, new Renal Ward – Doc Review, ATO
- SJOG Busselton, new Renal Ward – Documentation Review
- John St Psychiatric Hostel – Documentation Review
- Health E, Marian Centre Psychiatric Hospital – Doc Review, ATO
- Immunology and Infectious Diseases Clinic, Murdoch University, DPU Documentation and Facility Review
- SJOG Mt Lawley, Admissions, Operating Theatres, Endoscopy, Day Procedure, CSSD, Kitchen, redevelopment – Documentation Review, ATO
- Peel Health Campus, new MRI Suite, SSU and ED- Documentation Review, Approval to Occupy
- SJOG Geraldton, Theatre non-compliance and various minor works- Documentation Review, Approval to Occupy
- Marie Stopes Clinic, Midland – Concept and Documentation and Facility Review
- Eucla Nursing Post Documentation Review and Approval